ROTOCONE VACUUM DRYER
ROTOCONE VACUUM DRYER :
- Before startup the rcvd operation check the following
- equipment cleaning status
- rcvd cone bulb cloth integrity and validity of the bag.( 90 days or 55+-5 batches)
- utilities ( hot water,nitrogen and vacuum )
- ensure sensor is working or not
- ensure the cyclone separator and vacuum receiver
- Before charging the material ensure butterfly value is closed
- charge the material through scoop and ensure earthing connected to rcvd and scoop
- switch on the rcvd and open the utilities like vacuum and hotwater.
- follow the vacuum and temperature limits as per the bpcrs
cyclone separator :